Yuma International Airport is seeking proposals for design build construction services to renovate the former Bet-Ko hangar into the new Yuma Pilot Center.
Project Name: Yuma Pilot Center
Contact: Gen Grosse, 928-726-5882
Date Advertised: November 10, 2009
Pre-Proposal Conference Date: November 19, 2009 at 10:00AM
Pre-Proposal Location: Airport Passenger Terminal Conference Rm
Response Due Date: December 3, 2009 NLT 2:00PM
Contract Signing: Anticipated within 30 days of Proposal Receipt
This contract will be a firm fixed price, limited duration airport construction project.
The Design/Build team's price should be inclusive for "any and all" necessary work and "any and all" necessary costs to bring the project to a successful and satisfactory completion as determined by the Airport.
Documents relevant to the RFP will be posted below as they become available. The proposers are responsible for ensuring they have the most current documents.
Posted Nov 20
Posted Nov 20
Posted Nov 20
Posted Nov 20
Posted Nov 22
Posted Nov 24 Note: This will be replaced in five hours with Addendum three. This is provide for information only.
Posted Nov 25. Note: Addendum 3 includes the structural report above, plus related changes to the RFQ.
Question: Do you want card swipe or proximity card readers. Answer: Proximity Card Readers tied into existing Access Control System.
Question: During night lockdown does an emergency alarm unlock all mag locks. Answer: Yes
Question: Where will the control panel for the access control be located. Answer: In the existing phone room.
Question: Is a Knox Box required. Answer Yes.
Question: Two or three interior cameras? Answer: Three.
Question: Night Vision Required? Answer. No.
Question: Does the CCTV system require external video monitoring? Answer: No.
| 